Installation of the month program

Installation of the Month Program

Our Installation of the Month program celebrates the technicians who take pride in doing things the right way. It highlights truckmount installs that go above and beyond the basics, with a focus on safety, thoughtful layout, and exceptionally clean workmanship. By recognizing these standout installations, we aim to set a higher standard, inspire best practices across the field, and showcase the skill and attention to detail that define a truly professional truckmount install.

What are we looking for? 

  1. Machine has been inspected and cleaned thoroughly for customer pick up
  2. All wires/hoses and accessories are routed protected and cleanly laid out
  3. The fuel pump is mounted correctly and has all pieces installed – through floor bulkhead fitting and hoses routed correct cleanly and safely with a filter close to fuel supply as possible
  4. All functions and accessories have been tested and have some test time applied on machine
  5. All tie down points have proper tie down plates used to bolt down machine and accessories.
  6. Machine is set in truck so the recovery tank lid can be opened to service basket filter daily

If you are having trouble uploading photos send them to Dennis.russell@hydramaster.com